|
It is easy to install your baptistery plumbing system with The Pre-Plumbed Baptistery™. Have
your baptistery arrive with the PBH heater, E-Z fill, drain holes cut, and the window and operation controls installed. Nine holes are required to install our E-Z fill system. We know where they need to be cut, plus we furnish the material to make all connections. The only thing that you will need to do is connect the water line, attach the drain, and install power to the heater. Factory installed. All fittings leak tested.
Click on pictures for larger views.

Typical installation shown. May vary by baptistery model. Baptistery and framing painted red to show detail. |
 E-Z Fill System
 |
 |
 Triple seal window installed.
 |
|